Press releases 2012

Nexans awarded first CORE-TAG® anti-theft cable technology contract by SNCF for the network of Réseau Ferré de France (RFF)

26/11/12

Société Nationale des Chemins de Fer (SNCF) has awarded Nexans its first contract to design and manufacture specialised rail cable that includes the new CORE-TAG® anti-theft cable technology.

More...

Nexans wins major subsea cable contract for Terna’s new HVDC power interconnection between Italy and Montenegro

30/10/12

Extensive expertise and capability in the delivery of high profile HVDC interconnection projects proves critical as Nexans secures its largest ever subsea cable contract

More...

Nexans and Fincantieri enter into Agreement for the supply of Halogen Free shipboard cables through enhanced logistics and engineering services

25/10/12

Nexans has won a 6 million Euro contract to manufacture and supply shipboard cables to Fincantieri, the Italian ship builder.

More...

Nexans launches a high-density multifiber optical cabling solution

9/10/12

With its 1008-fiber technology, Nexans establishes its position as a key player in the urban FTTH infrastructure sector

More...

Press release

28/09/12

Paris, September 28, 2012. Following receipt of expressions of interest, Nexans is exploring the possibility of the sale of its Berk-Tek copper and fiber cable activity in the US.

More...

Nexans unveils its anti-theft cable solutions at InnoTrans 2012

17/09/12

Nexans is launching its new anti-theft cable solutions at InnoTrans – which promises to help network operators reduce the high volume of copper cables theft along their railway networks.

More...

Nexans’ complete Flamex range of cables to equip Hyundai Rotem high speed trains Contract value worth around 3.5 million Euros

13/09/12

Nexans has been awarded a contract worth around 3.5 million Euro to manufacture and supply specialized rolling stock cables to Hyundai Rotem, for 10 high-speed train sets KTX-II it is manufacturing for Korail, South Korea’s national railway operator.

More...

Appointment of the HS Product Manager - PABG

6/09/12

September 6th, 2012 - Effective September 3rd 2012, Gergely (Greg) Sari, is appointed Heat Shrink Product Manager - PABG.

More...

Nexans secures 10-year global frame agreement with BP to supply umbilicals and pipeline heating systems for global oil and gas projects

Nexans has secured a 10-year global frame agreement with BP International Limited, UK to supply umbilicals, DEH (direct electrical heating) systems, accessories and services for various oil and gas projects worldwide.

More...

2012 First Half-Year Results

25/07/12

Paris, July 25, 2012 – The Nexans Board of Directors met on July 24, 2012, under the chairmanship of Frédéric Vincent, to approve the Group’s consolidated financial statements for the first half of 2012.

More...

Nexans to supply HV and MV cables for the upgrading of Libya’s power transmission and distribution infrastructure. Contracts value worth 110 million Euros

19/07/12

Nexans has been awarded contracts worth around 110 million Euros by Libya’s PEWCO (Public Electrical Works Company) to supply cables for projects to upgrade the country’s power transmission and distribution infrastructure.

More...

Nexans rolls out green wooden cable drum return programme

Nexans continues to reinforce its commitment to sustainable development by rolling out a new programme to collect and reuse its wooden cable drums.

More...

Nexans’ innovative overhead line technology helps Brazil solve electricity transmission problems in its large cities

3/07/12

Nexans has worked with Light, Rio de Janeiro’s electric utility, to develop the innovative Lo-Sag™ conductor to help solve Brazil’s crucial issue of supplying more electricity to its large urban centres.

More...

Nexans breaks ground on its first high voltage (HV) cable manufacturing plant in North America

13/06/12

Nexans has started the construction of its first high voltage power cable manufacturing plant in North America.

More...

Nexans completes cable contract for Beirut City Center, eco-friendly shopping mall in Lebanon

11/06/12

Nexans has completed a $1.6 million cable contract for Majid Al-Futtaim Properties to supply the power, communications and fire safety cables required for the construction of Beirut City Centre – a 158,000 sqm, $40 million shopping mall.

More...

Nexans awarded 16 million Euro umbilical contract by Statoil

7/06/12

Nexans has secured a 16 million Euro contract with Statoil to engineer and supply a 16.5km subsea power umbilical that will be used to connect the Gullfaks C platform in the North Sea to its subsea compression and processing equipment.

More...

Nexans to launch an increase in capital reserved for its employees

16/05/12

Paris, May 16, 2012 – Nexans announced on February 8, 2012 the implementation of a new employee shareholding plan. This press release aims to detail certain features of the capital increase reserved for Group employees.

More...

2012 First Quarter Financial Information

25/04/12

Paris, April 25, 2012 – Nexans today announced 2012 first-quarter sales of 1,752 million euros.

More...

Nexans wins over 50 million Euro contract to supply high-voltage power cable for Northwind offshore wind farm

10/04/12

Nexans has won a contract worth more than 50 million Euro to supply a total of 57 km of high-voltage subsea power export cables to Northwind NV in the North Sea.

More...

Nexans’ 2011 Registration document - Mixed Shareholders’ Meeting of May 15, 2012

5/04/12

Paris, April 5, 2012 – Nexans’ 2011 Registration document has been registered with the AMF (Autorité des Marchés Financiers) on April 4, 2012. It is available to the public in accordance with applicable laws and regulations and is available online on Nexans’ website

More...

Nexans launches Shareholder E-Club

2/04/12

Nexans has created a Shareholder E-Club portal on its website. The portal now provides Nexans individual shareholders with a single place on the internet to gather all the information about the Group and in particular multimedia presentations.

More...

Nexans Signs Dow Inside Partnership Agreement

21/03/12

Nexans becomes a Dow Inside alliance partner

More...

Nexans announces new US High Voltage cable manufacturing plant to be located in Berkeley County, South Carolina

21/03/12

New plant at the Bushy Park Industrial Complex in Berkeley County, will reinforce Nexans’ current position in the fast growing High Voltage market as well as extending its presence in North America

More...

Nexans Research Centre celebrates 10 years of innovation in Lyon, France

19/03/12

Nexans proudly celebrates 10 years of innovation at its Lyon-based Corporate Research facility.

More...

To precisely match medical imaging and invasive applications, Nexans launches NEWSENSE™ range of cable solutions at MEDTEC Europe 2012

13/03/12

Nexans is launching its NEWSENSE™ brand of medical micro and composite power and data cables at MEDTEC Europe.

More...

Not for distribution directly or indirectly in the United States, Canada, Australia or Japan / OCEANE: Results of the standing repurchase order of outstanding 2013 OCEANE - Rating of the OCEANE 2019

8/03/12 More...

Nexans completes acquisition of AmerCable Holdings Inc.

1/03/12

Paris, March 1st, 2012 – Nexans confirms that it has completed the acquisition of AmerCable on February 29, 2012.

More...

Nexans has been awarded a four-year contract to supply airfield lighting cable contract for India’s Modernisation of the Airfield Infrastructure (MAFI) project

28/02/12

Nexans to supply specialized medium voltage  and low voltage airfield lighting cables for the Indian Air Force’s ‘Modernization of the Airfield Infrastructure (MAFI)’ project to Tata Power’s Strategic Electronics Division, India.

More...

KINOPTIC extends reach into the network and lowers costs

Nexans is using its presence at this year’s FTTH Council Conference and exhibition to highlight its extended KINOPTIC™ brand of end-to-end turnkey FTTH solutions.

More...

Acquisition of AmerCable Holdings Inc. for US$275m

13/02/12

Paris, February 13th, 2012 – Nexans makes a major investment in the growing Mining, Oil & Gas and Renewable Energy cable markets.

More...

2011 Full-Year Results

8/02/12

Paris, February 8, 2012 - The Nexans Board of Directors meeting on February 7, 2012, chaired by Frédéric Vincent, approved the Financial Statements for 2011.

More...

RWE Deutschland, Nexans and KIT launch “AmpaCity” project: the world’s longest superconductor system to replace inner-city high-voltage cable

19/01/12

The “AmpaCity” project has been kicked off: The RWE Group and its partners are just about to replace a 1-kilometre-long high-voltage cable connecting two transformer stations in the Ruhr city of Essen with a state-of-the-art superconductor solution.

More...

Nexans goes live on grid with world’s first fault current limiter based on second-generation superconductors

Nexans has successfully commissioned the world’s first resistive superconducting fault current limiter (SFCL) based on second-generation superconductor tapes.

More...